All the gaskets, seals and bearings have arrived, along with the new conrods. The list of needed parts is getting shorter (yay!). Still needing an ignition system (thinking of RGV250 - VJ21 (is that the 270° firing one?)), fairings (I'd like ZXR250A or ZXR400H1) and chambers (build them myself I think).