Slowly getting there. The mounting bracket has been completed for the right side – I’ve made it so I can use the factory rubber grommets to absorb any vibration and allow a bit of movement. Brackets take a bit of pissing around with – 2 hours went into this one and there is a dud one in the bottom of the rubbish tin! The left muffler has the joiner and mid pipes fabricated and tack welded together – visibly held held on in the pictures with a bungee strap! The ...