electricunts:
shed runs as spur off main building. Breaker inside house is 20a (with earth leak (dipole?) rcd thing), shed board has 2x 15a gpo and 1x 5a lighting circuit. 40a total aye
House board has 140a total on the face of it, with the 'main' being 3gang 240/415
this sounds like three phase, which might come in handy in the shed, but 'slike its only one phase going to, yea?
So, can i put a 40 or 50a breaker inside house, as by the time im making noise with tools im over 20a, and walking over and flipping itd be a cunt.
Yes/no?
2, can i drag full 3 phase to the shed? What is code requirement re ducting/poles/conduit?
Then, presumably i can tap off single phase too?
Concrete finisher cunts:
the floor is 6-10 slabs jigsawed together. 80sq meters.
Total variation over 30mm, chips, holes etc. Plus oil stains and shit.
Can i hit it with leveller compound? (any prep?) Am i better boxing up and tying another (4") slab on top? Or grinding down 5-10?
As much as id love to epox it, its probably going to have to deal with mere paint. Only one bay will have trolley jack abusing it as i plan on a gantry. The rest is basically workshop floor, no doubt the odd oil or coolant spill but generally just walked on...
Bookmarks