Stripped down the front end last night and cleaned out the headstock bearings of old grease which had started to granulate from sitting so longthe bearings & races are in good condition so have repacked with grease and re-assembled the triple tree. The forks are going to get flushed out & have a dose of new oil and general tidy-up.
The front & rear brakes are in for a strip & clean also as well as new fluid. Pads both ends are in fairly good condition with enough life left in them to still be used for a bit.
The swingarm has been reassembled with all the bushes & moving parts having been cleaned & repacked with grease. And is now fitted back into the frame ready to be torqued up.
Exhaust has been stripped down, scrubbed down to get rid of rust, rust treated, and painted with a black high temp ceramic fortified paint. And the muffler has been repacked. The exhaust system is actually a Premier system from aussiewhich matches the age of the bike nicely.
The wiring loom has had a good clean & check, with some dodgy looking connections being replaced and all others cleaned & firmed up. The only item in the system that wasn't working was the sidestand light so have to investigate further into that one, the bulb is good so it's elsewhere in the circuit. Fitted the new tail light unit but had to change the connector from a four pin to three pin to match the existing unit on the loom.
The bodywork has had a good wash and polish and is ready to be fitted when the time comes.
Bookmarks