I've just ordered a new faster server as the current one is struggling to cope with the demand placed on it. Hopefully we will be running on the new server before the end of the week. There should be a 60-90 min outage when I do the transfer. I will keep you informed.
Yep, we've come a long way from running on a 166Mhz laptop with 80MB memory.
Current server:
Intel Celeron D 2.4GHz
2GB RAM
160GB IDE Hard Drive
New server:
Pentium 4 (Prescott) 2.8GHz
2GB DDRAM
160GB SATA Hard Drive
http://www.meganetserve.com/

 
			
 
						
					 
					
					




 
						 Server Upgrade (done)
 Server Upgrade (done)
		
 
		
				
				
					 Reply With Quote
  Reply With Quote 
						
					
 
				 Karma ... Justice catches up eventually !!
 Karma ... Justice catches up eventually !! 

 
				 
						
					

 
				 
						
					 
						
					
 Originally Posted by SpankMe
 Originally Posted by SpankMe
					
 
						
					
 
				 
						
					
 
						
					

Bookmarks