Results 1 to 10 of 10

Thread: Cement & Concrete Association of New Zealand - MUST READ!!!

  1. #1
    Join Date
    13th July 2006 - 20:14
    Bike
    06 GT250R Electric Mango
    Location
    West Auckland
    Posts
    550

    Cement & Concrete Association of New Zealand - MUST READ!!!

    This article crossed my desk today. We really need to approach these guys as they will have heaps of data confirming what we already know about concrete vs steel.

    References for article:

    http://www.sustainableconcrete.org.nz

    http://www.highways.gov.uk/knowledge/11569.aspx

    http://www.concretebarrier.org.uk/overview/home.html
    Attached Thumbnails Attached Thumbnails Click image for larger version. 

Name:	article.jpg 
Views:	91 
Size:	214.3 KB 
ID:	76205  

  2. #2
    Join Date
    24th May 2006 - 09:23
    Bike
    2012 Bandit 1250SA, 2006 Hyosung GT250
    Location
    Stokes Valley
    Posts
    632
    I've passed this onto our roading designer here at work

  3. #3
    Join Date
    25th June 2005 - 10:56
    Bike
    EX500s - Ruby
    Location
    Napier
    Posts
    3,754
    That makes for some interesting reading.
    Initial cost of concrete vs other ..0.2 % higher, with a manitenance free lifespan of not less than 50 years!!
    Gotta be better than WRB and armco!
    I know what I'd rather they spend my money on...
    Diarrhoea is hereditary - it runs in your jeans

    If my nose was running money, I'd blow it all on you...

  4. #4
    Join Date
    13th July 2006 - 20:14
    Bike
    06 GT250R Electric Mango
    Location
    West Auckland
    Posts
    550
    I see that these guys are based in Wellington. Anyone of the Wellington group/representative is able to approach them and see whether we can help each other.

    Courier Address:
    Level 6, 142 Featherston Street
    Wellington
    New Zealand

    Postal Address:
    P O Box 448
    Wellington 6140
    New Zealand

    Phone: 64 4 499 8820
    Fax: 64 4 499 7760

  5. #5
    Join Date
    25th January 2006 - 15:33
    Bike
    Honda NT650 The Stealth Bomber
    Location
    New Plymouth
    Posts
    571
    Good find Furb@r! I'm sure purely from an economic (as in increasing their profits) point of view they would be VERY interested in hearing our current concerns on other forms of road barrier, let alone any sort of altruistic concern.
    Illuc ivi, illud feci.

    Buggrim, Buggrit.

  6. #6
    Join Date
    24th May 2006 - 09:23
    Bike
    2012 Bandit 1250SA, 2006 Hyosung GT250
    Location
    Stokes Valley
    Posts
    632
    I was speaking to our road design guys here at work regarding concrete barriers.

    One advantage they pointed out with the wire barriers is that they take up less room to INSTALL, as the concrete barriers have a much wider base.

    This is the case with Wellington's Centennial Highway which has a confined space requirements.

  7. #7
    Join Date
    13th July 2006 - 20:14
    Bike
    06 GT250R Electric Mango
    Location
    West Auckland
    Posts
    550
    Quote Originally Posted by Dodger View Post
    I was speaking to our road design guys here at work regarding concrete barriers.

    One advantage they pointed out with the wire barriers is that they take up less room to INSTALL, as the concrete barriers have a much wider base.

    This is the case with Wellington's Centennial Highway which has a confined space requirements.
    That is true. But for a wire rope barrier to function as they were intended there needs to be room for the car to "stretch" the ropes out.

    Based on how they were designed they would be useless in a confined area as it wont prevent a head on collision. Most guidelines recommend a 3m offset to the lane to allow for this "stretching".

  8. #8
    Join Date
    24th May 2006 - 09:23
    Bike
    2012 Bandit 1250SA, 2006 Hyosung GT250
    Location
    Stokes Valley
    Posts
    632
    It seems comes down to a wire barrier is better than no barrier in a confined location.

    Yes, they need stretch room for the few seconds that a car hits, but when they are just sitting there doing nothing they don't need this extra room.

  9. #9
    Join Date
    8th November 2004 - 11:00
    Bike
    GSXR 750 the wanton hussy
    Location
    Not in Napier now
    Posts
    12,765
    Quote Originally Posted by Dodger View Post
    It seems comes down to a wire barrier is better than no barrier in a confined location.

    Yes, they need stretch room for the few seconds that a car hits, but when they are just sitting there doing nothing they don't need this extra room.
    I don't understand the so-called claim of confined area. If one was to throw a tape measure over the white lines with either barrier between, there would be precious little difference and concrete does not need deflection room.
    Besides, this argument goes out the window in the case of the Western Hutt MW, with it's nice median strip having been there for years.
    Do you realise how many holes there could be if people would just take the time to take the dirt out of them?

  10. #10
    Join Date
    26th September 2005 - 21:14
    Bike
    05 450 EXC, 990 S
    Location
    Christchurch
    Posts
    3,642
    Note the English findings were for roads with an AADT (Average Annual Daily Traffic) over 25000 vehicles per day. This may not compare to the costs etc for NZ but most of the motorways in Auck meet this.

    Find out more about the CSB barriers.

    Cheers R
    "The ultimate result of shielding men from the effects of folly is to fill the world with fools." - Herbert Spencer, English Philosopher (1820-1903)

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •