Standard TZR Porting. Any ideas??
Some though is required before the sleeve is done. as it is going to be 6mm smaller in dia. and they have suggested that any port changes should be made before/at sleeving as they can buildup or remove structure easily. and once done the sleeve will be ready to install and run, so unless i want to risk damaging the bore playing with ports, then best done now!!!!