Page 3 of 4 FirstFirst 1234 LastLast
Results 31 to 45 of 52

Thread: High electricity prices likely.

  1. #31
    Join Date
    14th March 2006 - 21:55
    Bike
    06 Bandit GSF 1200SK6
    Location
    Levin, Manawatu
    Posts
    6,404
    Quote Originally Posted by u4ea View Post
    awww yur a gem...Ide be alright if the copper was still functional

    ohhhhhhhhhhhhhh blardy hell chick
    Have to Karma ... Justice catches up eventually !!

  2. #32
    Join Date
    21st August 2004 - 12:00
    Bike
    2017 Suzuki Dl1000
    Location
    Picton
    Posts
    5,177
    Quote Originally Posted by mashman View Post
    "The Domestic Energy Users' Network says the wholesale price for electricity has risen from 8.5 cents per kilowatt hour on the first of December to 23 cents per kilowatt hour two days ago."

    Not so bad in the summer, but that's gonna be a bit of a bastard come winter time. Wonder why the huge jump?
    And between 18 and 32 c/kwh today. Just be glad this is the wholesale price and not truely reflected in the retail price.

    The reason is really quite simple. Since the end of winter the whole world has been plunged into a La-Nina weather pattern. Its the steepest drop in the SOI since 1955, and completely counters the expectations from Global warming. The effect on our hydrology is for a drier than normal period, and at present inflows are around half of normal. Meridian is holding back water in its storage lakes, Mighty River doesn't have much water to realease anyway and Contact is releasing around a third of the rated Hawea maximum in readiness for next winter.

    Otahuhu combined cycle station, 2 Huntly units and 3 Manapouri generators are all out for maintenence and this reduction is being made up from more expensive generation.
    Time to ride

  3. #33
    Join Date
    14th March 2006 - 21:55
    Bike
    06 Bandit GSF 1200SK6
    Location
    Levin, Manawatu
    Posts
    6,404
    Quote Originally Posted by Jantar View Post
    Otahuhu combined cycle station, 2 Huntly units and 3 Manapouri generators are all out for maintenence and this reduction is being made up from more expensive generation.
    how many poles are out over cook straight .. is it 1, 2 or more ??
    Have to Karma ... Justice catches up eventually !!

  4. #34
    Join Date
    21st August 2004 - 12:00
    Bike
    2017 Suzuki Dl1000
    Location
    Picton
    Posts
    5,177
    Quote Originally Posted by chanceyy View Post
    how many poles are out over cook straight .. is it 1, 2 or more ??
    There are only 2 poles. Pole 1, the old mercury arc valve pole, is only available in north transfer, Pole 2 is available for both north and south transfer. there are 3 cables available across the straight, but only 2 are needed, one for each pole.
    Time to ride

  5. #35
    Join Date
    20th June 2008 - 23:51
    Bike
    ducati 600ss / a 100
    Location
    wellsford
    Posts
    618
    why hasn't the kaipara harbour been tapped?
    why don't they put solar panels under the wind turbines,(the infrastructure to send it out is already there).
    forsale A100,awesome power.
    near ready for bucket raceing,or just a padock,beach hack.
    gotta be a good deal,surely

  6. #36
    Join Date
    24th July 2006 - 11:53
    Bike
    KTM 1290 SAR
    Location
    Wgtn
    Posts
    5,541
    Quote Originally Posted by Jantar View Post
    There are only 2 poles. Pole 1, the old mercury arc valve pole, is only available in north transfer, Pole 2 is available for both north and south transfer. there are 3 cables available across the straight, but only 2 are needed, one for each pole.
    What's the "POLE 3" project currently under construction at Haywards, any idea?
    Go soothingly on the grease mud, as there lurks the skid demon

  7. #37
    Join Date
    21st August 2004 - 12:00
    Bike
    2017 Suzuki Dl1000
    Location
    Picton
    Posts
    5,177
    Quote Originally Posted by Ocean1 View Post
    What's the "POLE 3" project currently under construction at Haywards, any idea?
    Pole 3 will replace the current Pole 1. It was planned in 1990 to be completed in around 2000. Max Bradford's electricty reforms canned it, and now it is desperately needed.
    Time to ride

  8. #38
    Join Date
    1st July 2007 - 17:40
    Bike
    my little pony
    Location
    shoebox on middle of road
    Posts
    1,522
    It is all smoke and mirrors, cost to generate hydro per kw old money, 0.5 to 1.5 cent per kwh.
    Cost to generate kw from coal /gas new money, 25 cents per kwh.
    Hence any new investment in generation needs to equal new money in investment and new money in cost, hence 25 cents in cost per kwh to play.

  9. #39
    Join Date
    21st August 2004 - 12:00
    Bike
    2017 Suzuki Dl1000
    Location
    Picton
    Posts
    5,177
    Quote Originally Posted by piston broke View Post
    why hasn't the kaipara harbour been tapped?
    why don't they put solar panels under the wind turbines,(the infrastructure to send it out is already there).
    Maybe someday, when the technology exists, and it is economical to do so, and resource consents are earsier to get, and ToW issues are fully sorted, then maybe it will happen. But the biggest hurdle will be the technology.
    Time to ride

  10. #40
    Join Date
    1st July 2007 - 17:40
    Bike
    my little pony
    Location
    shoebox on middle of road
    Posts
    1,522
    Are the wholesale prices not actually the spot prices?

  11. #41
    Join Date
    21st August 2004 - 12:00
    Bike
    2017 Suzuki Dl1000
    Location
    Picton
    Posts
    5,177
    Quote Originally Posted by Coldrider View Post
    Are the wholesale prices not actually the spot prices?
    Yes they are.
    Time to ride

  12. #42
    Join Date
    2nd January 2009 - 19:08
    Bike
    Bikeless.NNnnnooooooooo!
    Location
    PhuBia PDR Laos
    Posts
    1,638
    Blog Entries
    10
    I started an NPV on a project I had in mind....converting our Mill and workshops to a waste oil fired heating system....Why?...because we generate 2.5 million liters of waste oil annually so it is free.....Then I call up the bean counters to get the cost of electricity....thinking I am about to save the company $zillions.

    3.94 US cents per kWh!

    Maybe we keep giving the waste oil to the villages....

  13. #43
    Join Date
    13th April 2007 - 18:26
    Bike
    06 scrambler,xrl,
    Location
    In town. Crap
    Posts
    4,155
    Blog Entries
    1
    Quote Originally Posted by Jantar View Post
    The only diesel back-up units on the National Grid are those at Whirinaki. Since our company has the operations and maintenence contract for them and we offer them into the market from our trading room, i am suprised to learn this for the first time on here. Where is the basis for this information?
    Havn't got all the details, and only heard it on the radio, but apparently they are being sold. But in the contract, they have to stay available for a minimum of two years, then the new owners can ship them overseas etc.
    Correct me if I'm wrong please.

  14. #44
    Join Date
    21st August 2004 - 12:00
    Bike
    2017 Suzuki Dl1000
    Location
    Picton
    Posts
    5,177
    Quote Originally Posted by tri boy View Post
    Havn't got all the details, and only heard it on the radio, but apparently they are being sold. But in the contract, they have to stay available for a minimum of two years, then the new owners can ship them overseas etc.
    Correct me if I'm wrong please.
    They were to be sold to Meridian, but Meridian didn't want them, preffering to stay entirely with renewable energy. Contact owns the land that they are on, and holds the resource consent. The crown has decided to offer them for sale by tender, but should they sell then they must be available for both the next two winters either from the present site, or from another site. They may leave the country, but it is highly unlikely that any buyer would relocate them for one year then move them overseas after that.

    The most likely buyers are Contact (we already own the site and hold the resource consents), Genisis to relocate to Huntly where they already have resource consents and can change them to gas fired, or Mighty River to relocate them to Southdown where they already have resource consents and can change them to gas fired.
    Last edited by Jantar; 18th December 2010 at 09:35.
    Time to ride

  15. #45
    Join Date
    31st July 2008 - 12:29
    Bike
    Thumpapotamus
    Location
    Tauranga
    Posts
    383
    Quote Originally Posted by piston broke View Post
    why hasn't the kaipara harbour been tapped?
    why don't they put solar panels under the wind turbines,(the infrastructure to send it out is already there).
    When you shade a photovoltaic cell even just a small portion of it you loose almost all its power output.

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •