I suspect my thermostat is stuck open.Timed it today and the temperature guage took longer than 5 min (at idle speed,choke on) to even move. As I use it for commutting and work at odd hours ,and the choke creeps off,causing engine to cut ,it is preferable for the bike to warm up quickly.The service manual doesn't give a specific time just saying " quickly".
This is the first watercooled bike I have owned ,so not sure how long it should take to reach normal operating temp? could those who have watercooled bikes please let me know how long their bikes take to warm up,before I go pulling it apart for nothing.
Thanks
P.S. I have a ZZR600.
Bookmarks