Well Its been all sitting around for some time. Today I actually started a proper to do list so I thought a would start a new tread coz that will keep me motivated to finish this bike as quick as I can. End result should be a good looking lightish good handling bike.
TA-DO
1. Get the wheels mounted. Have nice new 15mm axels for the RS wheels just need to make spin up some spacers.
2. Get the engine in. I have been mulling over the best way to mount the thing forever. At the moment I am thinking to copy the FXR position exactly. All measurements taken from the bike setup with know static sage. On the FXR the out put shaft is 100mm from the swing arm pivot. Also if you draw a line from the centre of the rear axle to centre of the swing arm pivot and onto the output shaft the output shaft is about 15mm lower than the centre line. Don't want no weird squat problems. Will soon see.
3. Make some rear sets.
4. Make new sub frame and sort the rider position. I really want to make sure that this is correct.
5. Suspension. Rear I have an NSR SP shock in really good condition and front are some nice MC28 forks. I will put emulators in the front and see what the rear is like when I can sit on it ride it. There is lots of setup info on the British NSR site. I am hoping its not under sprung but it could well be.
Lots of other little things bolts and bits but all easy to sort. Really looking forward to getting it all done and racing.
![]()
Bookmarks