    If you had wondered about the new camera poles being erected along SH2:

    PETONE TO TERRACE TUNNEL HIGHWAY TRAVELLER INFORMATION PROJECT


    Highway traveller information will be getting a further boost in the New Year when NZTA begins construction on the second stage of a comprehensive electronic monitoring system between Wellington and Petone.


    The Advanced Traffic Management System (ATMS) Project is scheduled to begin at the end of the official holiday period in January with contractor HEB Smithbridge installing fibre optic cable, closed circuit television (CCTV) cameras and electronic signage along State Highway 1 and 2 between the Terrace Tunnel and Petone overbridge.


    The aim of this work will be to give road users more real time traveller information about incidents and traffic conditions. By installing cameras and electronic signage we will be in a better position to see what’s happening on the highway and advise motorists what to expect or give them options to consider before heading onto the road.


    This work follows on from an earlier stage carried out between the Terrace Tunnel and Ngauranga Gorge. The ATMS system will work in tandem with other electronic signs on the state highway network in the Wellington region and forms part of our traffic management centre coordinating state highway road use.


    Construction work on the ATMS project involves the erection of several gantry structures across State Highways 1 and 2 to accommodate new signs, laying of ducts for new power and communications cables to supply and control the new signs and cameras. The work has been planned to minimise any impact to road users, including cyclists. However, due to the very narrow road corridor between Petone and Ngauranga, construction will require significant lane and shoulder closures up to 2km in length during construction.


    < strong>ROADING IMPACT - SOUTHBOUND

    From 5 January until the end of February 2009, sections of the shoulder and inside lane will be closed to all vehicles, including cyclists, from 7.00pm until 6.00am. As the road will be restricted to a single lane it will be unsafe for cyclists to use this lane and they will be diverted onto the existing southbound cycle track.


    Out of construction hours (during the day from 6.00am until 7.00pm) the highway will be cleared of all construction traffic and the work area will be safe. This will include placing steel plates over pits excavated for cable installation and gentle asphalt ramps will be constructed on and off the steel plates. A friction surface will be applied to the steel plates to minimise any skid risk.


    < strong>ROADING IMPACT – NORTHBOUND

    Between mid January and April 2009 some activity will continue overnight between 7.00pm and 6.00am until the project is finished in mid to late 2009. Small lane and shoulder closures will be required for the construction of new safety barriers, maintenance parking pads and new roadside equipment (camera poles, cabinets and one gantry). Dedicated cycle access through the work area will be maintained throughout.


    During the day, all equipment and associated material will be removed as much as possible from the site to ensure the area is safe. There should be minimal impact on the northbound shoulder of the highway.


    Overall, the project is expected to be completed in mid to late 2009 and we ask for your patience and understanding while we carry out this work.


    We want to ensure you are aware of what we are doing in your area. As part of our commitment to keeping you informed, please feel free to contact HEB Construction by telephone on 04 563 6810 any queries or concerns.

  2. #2
    Join Date
    9th October 2003 - 11:00
    Bike
    2022 BMW RnineT Pure
    Location
    yes
    Posts
    14,591
    Blog Entries
    3
    I thought it might have been something useful, like increasing data capacity between the Hutt and Wellington, so the Internet went faster.

    No, instead it's a big brother project.

    The one piece of road in Wellington that doesn't need this sort of service. You know it's all fucked up when the traffic isn't moving at Melling and all junctions South.
    If a man is alone in the woods and there isn't a woke Hollywood around to call him racist, is he still white?



  3. #3
    Join Date
    1st November 2005 - 08:18
    Bike
    F-117.
    Location
    Banana Republic of NZ
    Posts
    7,048
    Big Brother needs more cameras.
    TOP QUOTE: “The problem with socialism is that sooner or later you run out of other people’s money.”

  4. #4
    Join Date
    17th October 2006 - 15:22
    Bike
    06 CBR600RR
    Location
    Wellington
    Posts
    425
    More electronic signage?

    Like the speed signs in Ngaraunga Gorge that look like they could be changed up or down depending on the traffic density, road conditions...yet seem to be permanantly on 80???
    We do not live to eat and make money. We eat and make money to be able to enjoy life. George Leigh Mallory, 1922

  5. #5
    Join Date
    15th September 2005 - 04:40
    Bike
    2007 CB900
    Location
    Naenae here I come
    Posts
    4,170
    Quote Originally Posted by Kinje View Post
    More electronic signage?

    Like the speed signs in Ngaraunga Gorge that look like they could be changed up or down depending on the traffic density, road conditions...yet seem to be permanantly on 80???
    Thats strange cos they were at 60 today .. and after an accident a few weeks ago they read 30 ... so I do seem them change on a regular basis
    Life is a gift that we have all been given. Live life to the full and ensure that you have absolutely no
    regrets.

    For your parts needs:

    http://www.motorcycleparts.co.nz/

  6. #6
    Join Date
    12th September 2003 - 12:00
    Bike
    Katana 750, VOR 450 Enduro
    Location
    Wallaceville, Upper Hutt
    Posts
    5,521
    Blog Entries
    26
    But they never get back to 100, even though the 80 was supposed to be a temporary limit.
    And I to my motorcycle parked like the soul of the junkyard. Restored, a bicycle fleshed with power, and tore off. Up Highway 106 continually drunk on the wind in my mouth. Wringing the handlebar for speed, wild to be wreckage forever.

    - James Dickey, Cherrylog Road.

  7. #7
    Join Date
    4th October 2008 - 16:35
    Bike
    R1250GS
    Location
    Wellington
    Posts
    10,242
    i also some sort of push button type thing associated with a cyclist symbol(near Ngauranga and at petone overbridge(heading north)

  8. #8
    Join Date
    26th September 2006 - 13:46
    Bike
    94 Suzuki RF900
    Location
    Location: Location!
    Posts
    428
    Quote Originally Posted by Kinje View Post
    More electronic signage?

    Like the speed signs in Ngaraunga Gorge that look like they could be changed up or down depending on the traffic density, road conditions...yet seem to be permanantly on 80???
    They need to set up more of these around the country - there are far too many 50km - 70km roads that, after a certain time, can be opened up to at least 80km. Same for reducing speed when there is heavy traffic/accidents.

    But that's using logic, a word our decision makers are not aware of.

  9. #9
    Join Date
    17th October 2006 - 15:22
    Bike
    06 CBR600RR
    Location
    Wellington
    Posts
    425
    Quote Originally Posted by Nasty View Post
    Thats strange cos they were at 60 today .. and after an accident a few weeks ago they read 30 ... so I do seem them change on a regular basis
    I stand corrected then - they happily go down
    We do not live to eat and make money. We eat and make money to be able to enjoy life. George Leigh Mallory, 1922

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •